12:00Rolling Stock533 words

Kazakhstan Takes Delivery of 111 Stadler Coaches as 557-Vehicle Deal Progresses

Kazakhstan has inducted 111 Stadler Kazakhstan-built coaches, with 162 of 191 vehicles planned for 2026 delivered and a 557-coach agreement with Stadler Rail running to 2030.

· 3 min journey

Stadler Rail-Aktie: Kasachstan erhält 111 neue Bahnwagen
Stadler Rail-Aktie: Kasachstan erhält 111 neue BahnwagenUriel Soberanes / unsplash

Calling at

  1. Kazakhstan added 111 Stadler Kazakhstan-built coaches to its fleet on 25 November 2026.
  2. A cooperation agreement with Stadler Rail covers 557 coaches in total by 2030.
  3. 162 of 191 passenger coaches planned for 2026 have been delivered; 51 came from RWS Wagon.
  4. Stadler coaches entered service on the Astana–Almaty route on 11 November and Nurly Zhol–Semey on 13 November.
  5. Stadler Rail shares traded at €31.01 at Lang & Schwarz at 12:37 on 25 November 2026.

Kazakhstan has added 111 passenger coaches built by Stadler Kazakhstan to its national fleet, pushing a cooperation agreement with Stadler Rail that calls for 557 vehicles in total by 2030.

The Kazakh Ministry of Transport disclosed the delivery on Wednesday, 25 November 2026, with the Trend News Agency carrying the figures. The intake is part of a broader 2026 target of 191 new passenger coaches for the national network. Of that number, 162 have now been delivered: 111 from Stadler Kazakhstan and 51 from RWS Wagon. That leaves 29 vehicles outstanding from the 2026 plan as the year closes.

Where are the new coaches running?

The first Stadler-built vehicles entered service on 11 November on the Astana–Almaty route, the country's principal long-distance corridor linking the capital with its largest city. Since 13 November the same rolling stock has also operated between Nurly Zhol and Semey. Nurly Zhol, near the Chinese border, and Semey in the northeast mark the eastern extent of the deployment.

According to the Kazakh transport authority, the coaches carry a full modern amenity package:

  • air conditioning
  • video surveillance
  • WLAN
  • vacuum toilets
  • USB charging sockets

Accessibility provisions include larger compartments for passengers with reduced mobility and lifting equipment for boarding. Those features translate directly into service quality on the two routes: the Astana–Almaty run is Kazakhstan's flagship connection, and the new vehicles replace older stock on corridors where comfort and onboard connectivity had lagged.

What does the 557-vehicle agreement mean?

The cooperation agreement with Stadler Rail covers the acquisition of 557 coaches by 2030. The 111 vehicles now delivered represent roughly one fifth of the contracted total, with four years remaining to complete the programme. At the 2026 delivery rate of just over a hundred vehicles per year, the full order would arrive close to schedule; any acceleration or slowdown in annual intake will determine whether the 2030 date holds.

The contract structure pairs a Swiss rolling-stock manufacturer with local production through Stadler Kazakhstan, alongside a second supplier, RWS Wagon, which contributed 51 of the 2026 deliveries. Kazakhstan's decision to split the 191-vehicle 2026 programme across two suppliers spreads delivery risk and builds domestic manufacturing capacity in parallel.

For Stadler Rail, the Kazakh fleet programme adds a steady multi-year order book in Central Asia. The 557-vehicle commitment runs alongside the company's established European and North American contracts, and the local assembly arrangement positions the Swiss manufacturer inside the Kazakh market rather than exporting to it.

How did the market react?

Stadler Rail shares traded at €31.01 at Lang & Schwarz at 12:37 on Wednesday, 25 November 2026, shortly before the delivery announcement was published at 12:45. The stock is listed on the SIX Swiss Exchange under ticker SRAIL, ISIN CH0002178181, and its Swiss market environment is linked through the SMI index.

No guidance change accompanied the announcement, and the delivery itself was already contracted under the 2030 agreement rather than representing new business.

The next measurable checkpoint for the programme comes with completion of the remaining 29 vehicles from the 2026 delivery plan, followed by the 2027 intake toward the 557-vehicle total due by 2030.

via ad-hoc-news.de (Source)

More from Rebecca Stone

Rebecca Stone

Show full bio

Senior reporter covering money, funding and market shifts around Rail industry news and analysis at Mainline Report.

399 articles

Connecting services · Related articles

  1. 21:04

    More than 100 Stadler sleeping coaches enter service in Kazakhstan

  2. 21:44

    Stadler CHARME coaches enter service on Astana–Almaty route

  3. 13:15

    Stadler prepares to launch aluminium rolling stock production in Astana

  4. 16:24

    Stadler signs train supply deal with Saudi Arabia Railways

  5. 09:08

    Stadler shows Flirt Nordic Express cars bound for Norway's long-distance routes

« Previous service