12:01ROPlt 7785 words

ÖBB to expand Cityjet fleet to 45 trains after 93% survey rating

ÖBB plans 45 Cityjet trains by end-2026 under a €1.5bn order for 109 Stadler KISS units, after 93% of surveyed CJX 9 passengers rated the new trains positively.

· 4 min journey

ÖBB’s new Stadler KISS units receive 93% positive ratings in passenger survey
ÖBB’s new Stadler KISS units receive 93% positive ratings in passenger survey17672941 / pixabay

Calling at

  1. ÖBB targets 45 Cityjet trains in service in Vienna and Lower Austria by end-2026.
  2. The programme covers €1.5bn for 109 Stadler KISS double-deck EMUs.
  3. Integral surveyed more than 600 CJX 9 passengers in early October 2026; 93% rated the trains positively.
  4. CJX 9 entered service in June 2026, runs every 30 minutes at peak and has a stated 25-minute Wiener Neustadt–Wien Meidling journey.
  5. ÖBB says the trains provide up to 25% more seats than the previous double-deck generation.

ÖBB plans to operate 45 new Stadler KISS double-deck trains in Vienna and Lower Austria by the end of 2026, within a €1.5 billion investment in 109 units. The expansion follows an early-October 2026 passenger survey in which 93% of more than 600 CJX 9 users rated the new Cityjet trains positively.

ÖBB is the operator, Stadler the rolling-stock supplier and Integral the market research institute that conducted the commissioned survey. No regulator is named. ÖBB’s evidence therefore comes from an operator-commissioned exercise focused on one operating corridor, while its fleet and route commitments remain plans.

Survey evidence and its limits

Integral surveyed more than 600 passengers travelling on CJX 9 services between Vienna and Wiener Neustadt in early October 2026. Integral reported: “93% of respondents rated the new Cityjet double-deck trains positively.” The timetable received a 90% positive rating; among passengers living in Wiener Neustadt, timetable satisfaction reached 92%.

The survey also recorded approval levels of 94% to 98% for train layout, modern design and the feeling of safety. Respondents aged over 65 valued comfort, while those under 25 preferred upper-deck seating.

These are measured passenger perceptions, not evidence on availability, punctuality or crowding. The announcement provides no sampling breakdown, response rate or margin of error, so the result applies most directly to the surveyed CJX 9 users. That is the evidence boundary. It cannot establish demand or acceptance on the regional routes where ÖBB intends to deploy the wider fleet.

CJX 9 operating pattern

The Cityjet trains entered passenger service in June 2026, initially operating between Vienna and Payerbach-Reichenau via Wiener Neustadt. During peak periods, CJX 9 trains run every 30 minutes. Their higher acceleration, combined with a limited-stop operating pattern (fewer intermediate stops), enables a 25-minute journey between Wiener Neustadt and Wien Meidling.

Together with Railjet services, the Cityjets provide fast half-hourly connections between Vienna and Wiener Neustadt during the morning and evening peaks. The operational gain is service frequency on a defined corridor: acceleration and a limited-stop pattern support the 25-minute run, while Cityjet and Railjet services together provide the half-hourly link.

The 25-minute figure is an operating claim tied to acceleration and a limited-stop pattern, rather than a published mean for all runs. The announcement gives no journey-time variability or peak-capacity data by service. Passenger approval can support the proposition, but it cannot demonstrate that added rolling stock has relieved crowding.

What does the expansion change for regional passengers?

ÖBB’s stated end-2026 target is 45 Cityjet units operating in Vienna and Lower Austria. That figure sits within a €1.5 billion investment in 109 Stadler KISS double-deck EMUs (electric multiple units, self-propelled passenger train sets).

The announcement does not state how many trains had been delivered by the survey, so 45 remains a year-end deployment target rather than a completed fleet count.

ÖBB describes the capacity benefit as “up to 25% more seats” than the previous generation of double-deck rolling stock. Its published feature list includes:

  • Low-floor access (a low entry floor for boarding)
  • Air conditioning
  • Passenger information displays
  • Wi-Fi
  • Multipurpose areas for bicycles, prams and luggage

The intended capacity outcome is more seats per vehicle; low-floor access affects boarding, air conditioning supports the cabin environment, and information displays assist wayfinding. The bicycle, pram and luggage areas allow bulky items to be accommodated outside standard seating. Without usable seat counts, loading data and a like-for-like vehicle comparison, however, the seat figure remains a stated design comparison rather than measured crowding relief. Capacity remains the open question.

The programme figure covers the wider purchase, while the 45-train target defines the planned Vienna and Lower Austria presence by year-end. The announcement provides no unit price, delivery sequence or operating-cost saving, so the €1.5 billion commitment cannot be converted into cost per seat or train from the information supplied.

ÖBB intends to deploy the fleet beyond the Vienna–Wiener Neustadt corridor on the north–south regional network, towards Retz, Znojmo, Bernhardsthal and Břeclav. These are deployment intentions; the announcement gives no branch-by-branch dates, service frequencies or train allocations. A survey confined to CJX 9 cannot establish passenger response on those four regional directions.

By the end of 2026, the practical test is whether ÖBB places 45 trains in service and turns the promised seat gain into additional peak capacity on the Vienna–Wiener Neustadt corridor and the regional routes. The 93% rating is measured evidence from one commissioned survey; the fleet size, seat comparison and wider deployment remain targets to verify against delivered vehicles and operating data.

via railmarket.com (Source)

More from Priya Raman

Priya Raman

Show full bio

Staff writer covering companies, deals and strategy in Rail industry news and analysis at Mainline Report.

391 articles

Connecting services · Related articles

  1. 13:10

    Siemens Mobility Unveils ÖBB Railjet M at InnoTrans 2026

  2. 15:00

    ÖBB commits €19.5bn to rail investment plan

  3. 22:23

    ÖBB and Siemens unveil Railjet M multiple-unit for Alpine routes

  4. 02:44

    BeNEX orders 56 Siemens EMUs for Mainfranken regional services

  5. 24:39

    Stadler Completes Double-Deck InterRegio Deliveries to SBB

« Previous serviceNext service »