00:39Freight Operations394 words
GB Railfreight signs 11-year steel contract with 7 Steel UK in Cardiff
GB Railfreight's 11-year deal with 7 Steel UK covers scrap inbound and finished steel outbound at Cardiff, with purpose-built scrap wagons entering service in 2027.

Calling at
- GB Railfreight signed an 11-year contract with 7 Steel UK; services start this month
- Two sets of purpose-built scrap wagons enter service in 2027, plus a modified set for rebar and coiled steel
- The Cardiff plant has 1.2 million tonnes annual capacity and uses 98% scrap, per the UK Steel Strategy
- UK steelmakers' scrap demand could rise from 2.2 million to 6.7 million tonnes a year by 2040
- GBRf previously signed a 12-year contract with Celsa Steel UK in 2021; Sev.en Global Investments acquired the firm in 2025
GB Railfreight has signed an 11-year contract with 7 Steel UK, covering inbound scrap and outbound finished steel traffic at the steelmaker's Cardiff operations, plus expanded on-site shunting and investment in new wagons.
Services under the expanded agreement begin this month. GBRf will haul scrap steel into 7 Steel UK's Cardiff facilities and move finished products to customers across the UK.
"This agreement is a significant milestone for GB Railfreight and we're proud to be expanding our relationship with 7 Steel UK," said GBRf Commercial Director Alex Kirk. "The contract provides a strong foundation for future growth and demonstrates the important role rail freight continues to play in supporting UK industry."
What rolling stock is GBRf committing?
GBRf is adding new rolling stock to support the contract:
- Two sets of purpose-built scrap wagons enter service during 2027
- An additional set of modified wagons will handle outbound rebar and coiled steel
The wagon orders signal that GBRf expects sustained volumes across both ends of the steelmaker's supply chain over the contract term.
How does the deal fit GBRf's history at Cardiff?
GBRf's presence at the Cardiff works predates 7 Steel UK. In 2021 it signed a 12-year contract with then-owner Celsa Steel UK for mainline haulage and internal shunting, building on a relationship of around a decade.
Sev.en Global Investments acquired Celsa Steel UK in 2025, and the business subsequently became 7 Steel UK. The new agreement extends GBRf's role under the site's new ownership.
Why does electric arc furnace steelmaking matter for rail?
The Cardiff plant is already one of the UK's largest electric arc furnace steelmaking sites. The government's Steel Strategy, published earlier this year, puts its annual capacity at 1.2 million tonnes and says 7 Steel uses 98% scrap in its products.
Unlike blast furnaces, electric arc furnaces melt scrap rather than relying primarily on iron ore and coking coal — and that raw-material switch directly shapes rail freight flows, since scrap moves in bulk by rail.
The strategy estimates British steelmakers currently consume around 2.2 million tonnes of scrap a year. It projects demand could rise to 6.7 million tonnes by 2040 as new electric arc furnace capacity comes online, potentially creating substantially larger domestic scrap flows to steelworks — a projection, not a measured result, but one that positions long-term scrap haulage contracts like GBRf's to capture future volume growth.
via gbrailfreight.com (Original)
More from Amara Osei
Show full bio
News editor covering technology and product news in Rail industry news and analysis at Mainline Report.
420 articles
Connecting services · Related articles
- 12:04
Amtrak conductors remove disruptive passenger in North Dakota
- 12:04
KT and Samsung report 29% cut in high-speed rail call drops
- 21:08
Investors back future passenger rolling stock investment
- 21:08
South Korea, Canada, Poland and Czech Republic order passenger rolling stock
- 21:08
BMRCL secures rolling stock approval for Pink Line trains