15:05PAPlt 3659 words

Dubai weighs 2.8 km driverless pod link to Bluewaters

Dubai’s RTA is studying a 2.8 km Bluewaters link that Glydways says could provide direct, non-stop pod trips with waits of 30-60 seconds, though fares and launch remain unset.

· 3 min journey

No stops, no sharing: How Dubai's driverless pods could work
No stops, no sharing: How Dubai's driverless pods could workOlgaozik / pixabay

Calling at

  1. RTA is studying a proposed 2.8 km link from National Paints Metro Station to Bluewaters.
  2. Glydways says commercial waits would last 30-60 seconds when no vehicle is waiting.
  3. Each Glydcar would carry four to six passengers, subject to cabin and mobility-space requirements.
  4. Bluewaters demonstration vehicles travelled at about 24 km/h; the network design allows up to 50 km/h.
  5. As of 17 November 2026, no launch date, final route, fleet size, fare or operating hours had been announced.

Olivia Hart

Dubai’s Roads and Transport Authority (RTA) is studying a proposed 2.8 km driverless-pod link from National Paints Metro Station to Bluewaters Island, with no public launch date, final route, fare or fleet size announced as of 17 November 2026.

Glydways, the vehicle and service developer, says the Bluewaters demonstration has concluded. The company is designing a broader Dubai network in which a passenger selects a destination, enters a climate-controlled autonomous electric vehicle, or Glydcar, and travels directly to an Access Point near the destination.

RTA is studying possible routes to close the gap between Metro stations and homes, offices, shops and attractions, where a long final walk or lengthy wait can push passengers back into their cars.

Mark Seeger, co-founder and co-CEO of Glydways, said: “A short gap at either end of a journey can determine whether someone uses public transport at all. If the final stretch involves a long walk in the heat or another lengthy wait, driving can become the more convenient choice.”

What would the Bluewaters link change for passengers?

The proposed Bluewaters link covers 2.8 km from National Paints Metro Station to the island. RTA has not confirmed the final route, station locations or number of vehicles required. Under Glydways’ concept, a Metro passenger transfers to a climate-controlled Glydcar and continues to an Access Point close to the chosen destination.

Seeger described the transfer: “Our aim is to make that connection straightforward: step off the Metro, board a climate-controlled Glydcar and travel directly to an Access Point close to where you need to go.”

Unlike a bus, shuttle or Metro train, Glydways says each Glydcar would make no intermediate stops to collect or drop off other passengers. Each individual, family or group of friends would receive its own vehicle for the trip, so the cabin would not be shared with strangers.

Each Glydcar is designed for four to six passengers. The usable capacity would depend on cabin layout and space for luggage, pushchairs or mobility aids. Glydways says the vehicles and stations are being designed to accommodate powered wheelchairs and provide level boarding.

Operating assumptions and access

During the Bluewaters demonstration, vehicles travelled at about 24 km/h. Glydways says the wider system is designed for speeds of up to 50 km/h, a design target rather than a demonstrated commercial speed. Actual journey times would depend on the final alignment, number of stations and operating plan.

For a commercial network, Glydways targets immediate boarding most of the time. If no vehicle is waiting, the company aims for a wait of around 30 to 60 seconds, with the result dependent on passenger demand and network design.

Destination selection would work through a mobile app or a kiosk, allowing passengers without smartphones to choose a destination. Glydways says its systems can support local payment arrangements, but RTA would decide whether that integration includes the nol card.

Glydways hopes the service would operate around the clock and charge fares comparable with a Metro or bus ticket. Final operating hours and fares would be set by RTA as part of the commercial plan, so neither the 24-hour proposition nor the price point is yet an operating commitment.

What remains undecided

As of 17 November 2026, Glydways had completed the Bluewaters demonstration but had announced no public-service launch date, fare or final route. For the Bluewaters study, the final route, station locations and vehicle count also remain unconfirmed.

RTA is studying the routes and will set final operating hours and fares within the commercial plan; it will also decide whether local payment integration includes nol. The test for the wider plan is whether the direct service, short waits and accessible vehicles can move from company design targets into a confirmed operating specification.

The next concrete milestone will be RTA’s confirmation of routes and a commercial plan that fixes fares, hours, fleet size and payment integration.

via khaleejtimes.com (Source)

More from Olivia Hart

Olivia Hart

Show full bio

Market editor covering people, launches and day-to-day practice in Rail industry news and analysis at Mainline Report.

394 articles

Connecting services · Related articles

  1. 24:44

    MBTA Orders October Service Outages Across Eight Lines for Infrastructure Push

  2. 01:04

    Austin advances three-mile airport light rail planning

  3. 02:45

    First passenger train runs under digital signalling on East Coast Main Line

  4. 19:30

    MTA opens scoping on 125 Street crosstown tunnel extension

  5. 24:49

    TransLink Begins Five Months of Overnight SkyTrain Testing

« Previous service