01:28Rolling Stock505 words
Amtrak Orders Eight 10-Car Airo Trainsets for Northeast Regional
Amtrak has added eight 10-car Airo trainsets to its Northeast Regional order, each seating over 640 passengers — 34% more than the eight-car sets — with service entry planned for 2031.
· 3 min journey

Calling at
- Amtrak ordered eight additional 10-car Airo trainsets for Northeast Regional service, entering passenger service from 2031.
- Each 10-car trainset seats more than 640 passengers, about 34% more than the eight-car Airo formations.
- Airo trains first entered service in September 2026 on Amtrak Cascades; Northeast Regional deployment begins late 2027.
- Siemens Mobility builds the trainsets in Sacramento, California, and Lexington, North Carolina, with 3,500+ components from nearly 100 suppliers in 31 states.
- The US Department of Transportation recently awarded Amtrak 2.05 billion USD for 43 domestically built trainsets.
Amtrak has ordered eight additional 10-car Airo trainsets for Northeast Regional services, with each formation seating more than 640 passengers — approximately 34 percent more than the eight-car Airo trains already planned for the corridor. Entry into passenger service is expected in 2031.
The order targets the busiest intercity rail market in the United States. In FY2025, 15.2 million passengers travelled on Amtrak's Acela and Northeast Regional services combined. Eight extra trainsets, however, represent a modest increment against that volume, and Amtrak has not stated how the additional seats translate into timetable frequency or specific capacity gains by route.
What changes and when?
The deployment sequence now runs across four years:
- Airo trains entered passenger service for the first time in September 2026 on Amtrak Cascades services in the Pacific Northwest.
- Further trainsets are expected on the Cascades network through mid-2027.
- Northeast Regional services switch to Airo in late 2027, initially in eight-car formations.
- The larger 10-car trainsets follow from 2031, also on Northeast Regional routes.
After the late-2027 introduction, Amtrak also plans Airo deployment on its Virginia routes. The 10-car additions will retain the existing Airo design, including passenger amenities and accessibility features.
Amtrak Interim President Byl Herrmann framed the order as a response to sustained ridership: "Demand for train travel isn't slowing down, and neither are we. For our customers, that means more seats, more availability when travel is busiest, and more chances to find a fare that fits their budget."
The fare claim carries a caveat Amtrak does not address: added capacity can ease peak-period scarcity, but seat supply alone does not determine pricing. No fare policy accompanied the announcement.
Who builds them, and under what funding?
Siemens Mobility manufactures the trainsets at facilities in Sacramento, California, and Lexington, North Carolina. The company sources more than 3,500 components from almost 100 suppliers across 31 US states.
Tobias Bauer, Managing Director of Siemens Mobility North America, said: "These trainsets represent the work of skilled manufacturing, engineering, and supply chain teams across our U.S. operations. Together, they are helping deliver the next generation of passenger rail technology while supporting reliable service for travellers nationwide."
The order sits within a larger rolling-stock programme. The US Department of Transportation recently awarded Amtrak 2.05 billion USD to acquire 43 trainsets manufactured in the United States, replacing ageing vehicles. Measured against that programme, the eight 10-car trainsets announced here account for roughly one in five of the funded fleet — a down payment on replacement rather than a full fleet turnover.
Testing is already underway on the Airo trains intended for Northeast Regional services. That is a measured step; entering service on schedule in late 2027, and then again in 2031, remains a projection contingent on testing outcomes and delivery rates from Siemens.
The corridor will not see the larger formations for at least six years; until then, capacity relief on Northeast Regional depends entirely on the eight-car deployment beginning in late 2027.
via railway-news.com (Source)
More from Amara Osei
Show full bio
News editor covering technology and product news in Rail industry news and analysis at Mainline Report.
411 articles
Connecting services · Related articles
- 03:48
Amtrak Orders Eight More 10-Car Airo Trainsets for 2031 Entry
- 14:20
Amtrak Airo trainsets enter Cascades service September 30
- 12:50
Amtrak Sets September 30 Service Date for Cascades Airo Fleet
- 13:46
Amtrak Cuts Ribbon on $250 Million Seattle Trainset Maintenance Facility
- 02:59
Amtrak Starts Airo Trainset Rollout, Replacing 1970s Amfleet I Coaches