24:39POPlt 6493 words
USDOT directs full $426.7M INFRA Track 1 pool to highways
The US Department of Transportation has allocated the entire $426.7 million Track 1 INFRA grant pool to highway-only projects, leaving rail and intermodal freight components without federal awards in the latest funding cycle.
· 2 min journey

Calling at
- USDOT allocated the full $426.7 million Track 1 INFRA pool to highway-only projects
- No rail or intermodal freight components received awards in the latest funding cycle
- INFRA operates on a two-track structure administered by USDOT's Build America Bureau
- Track 1 typically sets a $25 million minimum federal award for highway and bridge components
- Rail applicants typically provide a 20 percent non-federal match for non-highway components
The US Department of Transportation has allocated the entire $426.7 million available under Track 1 of the INFRA grant program to highway-only projects, leaving rail and intermodal freight components without an award in the latest funding cycle.
INFRA — the Infrastructure for Rebuilding America program — is USDOT's primary discretionary multimodal freight grant, supporting highway, bridge, port, rail, and intermodal work that strengthens the National Highway Freight Network. The program was created under the Fixing America's Surface Transportation Act of 2015 and continued under the Infrastructure Investment and Jobs Act of 2021.
What does Track 1 cover?
The program operates on a two-track structure. Track 1 supports larger freight projects above defined minimum thresholds; Track 2 funds smaller projects with a lower entry point. USDOT's Build America Bureau administers both tracks, scoring applications on project readiness, multimodal freight benefit, and the share of non-federal matching funds an applicant brings to the table.
Track 1 typically sets a $25 million minimum federal award for highway and bridge components, with lower minimums available for non-highway freight elements such as rail intermodal terminals, highway-rail grade separations, and short-line connectors.
What does the allocation mean for rail?
Earlier INFRA rounds have included rail recipients alongside highway work. Past awards funded intermodal terminal upgrades, rail-highway grade separations, and short-line capital improvements, with applicants typically providing a 20 percent non-federal match for non-highway components. The shift to highway-only funding in the current cycle narrows the federal pipeline for rail freight work.
Rail developers typically combine INFRA funds with state and private matching dollars. Short-line operators in particular have used the program to cover the federal share of bridge, track, and intermodal facility upgrades, with state programs and operator capital supplying the remainder. Without rail in this award slate, those projects must find other federal sources or proceed without a federal cost-share.
What kinds of rail projects have used INFRA previously?
Past INFRA cycles have drawn applications from state departments of transportation, port authorities, Class I and short-line railroads, and metropolitan planning organizations. Awarded rail work has included:
- Intermodal terminal expansions at inland ports
- Highway-rail grade separations on congested corridors
- Short-line bridge and track rehabilitation
- Port-to-rail connector improvements
USDOT did not release a full project list as covered by Railway Supply. Award recipients and their geographic distribution remain to be confirmed through the department's project summaries.
Where does rail funding go next?
Rail applicants will look to the next INFRA notice of funding opportunity and to parallel federal freight grant programs — including the Consolidated Rail Infrastructure and Safety Improvements (CRISI) program and the National Infrastructure Project Assistance (Mega) program — to gauge whether non-highway freight components regain funding share in future cycles.
USDOT's award slate signals a highway-priority posture for this INFRA cycle, and rail applicants will assess future notices for any return of multimodal funding allocation.
via Google News: Freight rail (Source)
More from Rebecca Stone
Show full bio
Senior reporter covering money, funding and market shifts around Rail industry news and analysis at Mainline Report.
384 articles
Connecting services · Related articles
- 16:05
Minnesota DOT awards grants for five freight-rail projects
- 22:33
DOT Unveils $2.04 Billion Package to Modernize US Rail
- 18:00
FRA Puts $5.3 Billion Behind Rail Safety and Amtrak Fleet Renewal
- 01:35
$37M Headed to Freight Rail Upgrades, Fox Bangor Reports
- 14:50
Minnesota Commits Nearly $4.5 Million to Rail Infrastructure Projects