24:39ROPlt 8508 words
MHI to Supply New Trainsets for Singapore's Sengkang-Punggol LRT
MHI will supply new trainsets for Singapore's Sengkang–Punggol LRT, continuing its long-running supplier role on the automated feeder line. Delivery dates and fleet numbers await confirmation.
· 3 min journey

Calling at
- Mitsubishi Heavy Industries will supply new trainsets for the Sengkang–Punggol LRT line in Singapore.
- The SPLRT is a fully automated, driverless feeder light rail network serving Sengkang and Punggol.
- MHI supplied the original SPLRT fleet, with the loops opening in 2003 and 2005.
- The announcement did not disclose fleet numbers, delivery dates or contract value.
Mitsubishi Heavy Industries (MHI) will supply new trainsets for Singapore's Sengkang–Punggol Light Rail Transit (SPLRT) line, replacing part of the existing fleet on one of the city-state's busiest automated people-mover corridors.
The announcement, reported by Railway-News, names MHI as the supplier for the new-build vehicles destined for the line, which serves the residential towns of Sengkang and Punggol in north-eastern Singapore and connects them to their respective Mass Rapid Transit (MRT) interchange stations.
What does the order cover?
The deal covers new trainsets for the SPLRT, a fully automated, driverless rubber-tyred light rail system operated as a feeder service within Singapore's rail network. The operator, SBS Transit, runs the line under licence from the Land Transport Authority (LTA), the national regulator and infrastructure owner that procures rolling stock for the network.
MHI already has a long-standing position in this market. The Japanese industrial group supplied the original SPLRT fleet and has previously delivered additional vehicles as ridership on the line grew. The latest order continues that supplier relationship and points to fleet renewal rather than a change of technology provider.
The existing SPLRT fleet consists of two-car rubber-tyred trains running on an elevated guideway, with the two loops — Sengkang and Punggol — sharing rolling stock and maintenance facilities.
Why renew the fleet now?
The Sengkang and Punggol LRT loops opened in January 2003 and January 2005 respectively, which places the oldest vehicles in the fleet at more than two decades in service. Fleet renewal at this stage of an asset's life cycle typically targets three outcomes:
- improved reliability, as worn components give way to new traction, control and door systems;
- higher capacity, if the new trainsets offer more carriages or greater standing density;
- lower maintenance costs, as newer stock reduces corrective interventions and parts obsolescence risks.
The announcement did not specify the number of trainsets ordered, the delivery timeline or the contract value, so the capacity and cost effects of the order cannot yet be quantified against the current fleet plan.
How does the line fit Singapore's network?
The SPLRT functions as the feeder layer of Singapore's rail hierarchy. Its two loops connect dense public housing estates to the North East Line MRT interchanges at Sengkang and Punggol stations, moving commuters between home and the heavy rail network in rides typically under 15 minutes.
Because the line is fully automated and driverless, new trainsets must integrate with the existing automatic train control and communications systems. Rolling stock contracts on the Singapore network generally include such signalling integration, along with initial maintenance support, as part of the supplier's scope.
What happens next?
Delivery dates and fleet quantities remain subject to confirmation from the LTA and MHI. Once the authority publishes contract details, observers will be able to assess how the order fits the wider renewal programme across Singapore's light rail and metro fleets, and whether the new trainsets expand capacity on the Sengkang and Punggol loops or simply replace like-for-like.
via Google News: Rolling stock (Source)
More from Rebecca Stone
Show full bio
Senior reporter covering business strategy at Mainline Report.
261 articles
Connecting services · Related articles
- 24:44
Alstom Completes Train Deliveries for Singapore's NSEWL Fleet Renewal
- 16:19
First New Train Delivered as Busan Metro Line 2 Fleet Renewal Begins
- 24:54
Oriental Rail Infrastructure wins INR 47.6 mn order from ICF
- 14:13
Oriental Rail Infrastructure Wins 16.5 Million Rupee Order From Modern Coach Factory
- 05:45
Oriental Rail Infrastructure Wins Rs 4.76 Crore Order from ICF